DAG server shutdown process

$
0
0

We have a 4 node DAG with 2 nodes in production and 2 nodes in DR. Also 2 CAS servers in each site. As part of some datacenter work we have to shutdown the DR servers. FSW is in the production site. DAC mode is enabled.What is the correct order for shutdown of servers? Do we need to suspend replication or start maintenance mode on the DR DAG servers?